Restumping and reblocking in Victoria: signs, costs and the permit most people don't expect

Restumping and reblocking in Victoria: signs, costs and the permit most people don’t expect

Thousands of Victorian weatherboard homes sit on timber or concrete stumps that were never meant to last forever. Original red gum stumps from the early twentieth century can rot at ground level, and early concrete stumps can crack or sink in reactive clay soils. When enough of them go, the floor follows.

Signs your stumps may be failing

  • Floors that slope, bounce or feel soft in places.
  • Doors that stick or swing open on their own, and gaps above door frames.
  • Cracks in plaster that run diagonally from the corners of doors and windows.
  • Gaps between skirting boards and the floor.
  • Stumps that look rotten, cracked or leaning when you look under the house with a torch.

Seasonal movement is normal in clay soils, so a crack that opens in summer and closes in winter isn’t proof on its own. A subfloor inspection will tell you whether it’s the stumps, the bearers, drainage, or something else.

Restumping vs reblocking

The terms are used interchangeably in Victoria. Both mean replacing the stumps that support the bearers and floor. “Reblocking” is more common in Queensland and New South Wales; “restumping” in Victoria. Replacement stumps are usually adjustable steel or concrete, set on new concrete footings.

A full restump replaces every stump. A partial restump replaces only failed ones. Partial jobs are cheaper but can leave a mix of old and new supports moving differently over time, so ask the builder to explain why they’re recommending one or the other.

What it costs

Item Typical range
Subfloor inspection and written report $300 – $900
Packing and re-levelling only, per stump $60 – $150
Partial restump, per stump $90 – $200
Full restump, small weatherboard (around 100 m²) $9,000 – $18,000
Full restump, larger home or poor access $18,000 – $35,000
Building permit and surveyor fees $700 – $2,500

Budget separately for plaster repairs, re-hanging doors, and plumbing adjustments. Lifting a house even 20–30 mm can crack cornices and shift pipes.

Permits and registration

Restumping is building work, not routine maintenance. It generally needs a building permit issued by a registered building surveyor before work starts. Any builder in the business of restumping or reblocking must be registered with the Building and Plumbing Commission regardless of the job’s value. For work over $10,000 you must have a written major domestic building contract, and above $16,000 the builder must provide domestic building insurance before work begins.

Check the builder’s registration on the regulator’s public register and make sure the name on the registration matches the name on your contract.

What happens on the job

  1. Inspection and permit. The builder or an engineer assesses the subfloor and soil. The building surveyor issues the permit, often with conditions about footing size and depth.
  2. Access. Floor coverings sometimes need lifting in spots, or the builder works entirely from underneath through access points. Low subfloors may need digging out for crew access.
  3. Supporting the house. The house is supported on temporary jacks while old stumps are removed in sections.
  4. New footings and stumps. Holes are dug to the specified depth and new concrete footings poured, with steel or concrete stumps set on them.
  5. Levelling. The floor is brought back to level gradually, often over several stages, to limit cracking.
  6. Inspections. The building surveyor inspects footings before they’re poured, and again at completion before issuing a certificate of final inspection.

A small to medium home usually takes one to three weeks, depending on weather, access and how much rot is found in the bearers.

Drainage: the cause behind many failures

Stumps often fail because water pools under the house. Leaking downpipes, broken stormwater pipes, garden beds built up against the walls and paving that slopes toward the house all keep subfloor soil wet. If you restump without fixing the water problem, the new footings are sitting in the same conditions. Ask the builder to note any drainage issues they see and get a plumber to fix them before or during the job.

Safety during the job

Older homes can have asbestos in subfloor sheeting, around the base of the house or in old fibro additions. Ask the builder how they’ll identify and handle it. WorkSafe Victoria sets out the rules for asbestos removal.

Questions to ask restumping builders

  1. Can I see your registration number and current insurance certificate?
  2. Who arranges the building permit, and is it in the price?
  3. How many stumps are you replacing, and what type?
  4. How deep and wide are the new footings?
  5. What happens if you find rotten bearers or joists? How is that priced?
  6. How much will you lift the floor, and what damage should I expect to plaster and doors?
  7. What warranty do you give on structural work?

Our Which tradie do I need? questionnaire can help if you’re not sure whether to start with a builder, a building inspector or a structural engineer.